Definitions
Sorry, no definitions found. You may find more data at b-line.
Etymologies
Sorry, no etymologies found.
Support
Help support Wordnik (and make this page ad-free) by adopting the word B-Line.
Examples
-
The project in the pictures below is called “B-Line Small” and it was built with a cost of $185/sq ft.
A seductive modern prefab with a touch of Italian class 2010
-
The Broadway Olympic Lanes reserved for B-Line—if we can show an improvement in service, while arguing simultaneously that the lanes ought to be in the middle of the R.O.W.—simply demonstrate that we can give priority to transit without losing cultural values related to the private automobile.
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
A tram driver can deliver 5 times as many passengers as a B-Line driver making the tram line cheaper to operate.
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
A more immediate action than the Tram extension to VCC-Clark would be to retain the “Olympic Lanes” for the B-Line on Broadway.
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
I still think the Clarke Road hill makes the planned route too expensive for the number of people likely to use the system in the next 50 years, but at least the Tri-cities have tried to develop the corridor in expectation of something with more appeal and capacity than the 97 B-Line.
-
Building Evergreen would potentially dump thousands of additional passengers onto a B-Line that cannot handle current demand.
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
The first step must be to secure funding and cooperation from the City of Vancouver to convert the 43 to a B-Line.
Vancouver says goodbye to Olympic streetcar « Stephen Rees's blog 2010
-
In ii, how are streetcars stuck in traffic different than the existing B-Line bus?
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
A tram driver can deliver 5 times as many passengers as a B-Line driver making the tram line cheaper to operate than what Coast Mountain is doing now.
Olympic Line (short) closure notice « Stephen Rees's blog 2010
-
Why spend quadruple the cost of the B-Line to merely replicate — or barely imnprove — its service?
Olympic Line (short) closure notice « Stephen Rees's blog 2010
Comments
Log in or sign up to get involved in the conversation. It's quick and easy.